1.3 Km of 750 mm HDPE Sanitary Forcemain and 400 m of 300 mm Watermain Installation, includes mechanical equipment. appurtenances and 750 mm Epoxy steel pipe supplied and install for numerous tie ins along the forcemain and 750 m3 of concrete poured.