Phase I 75 lots, 2.1 km of road construction 5km of utility installation and 75 services, Clear and grub 22 acres, Blasted and excavated 48.000 m3 of blasted material, place 40.000 m3 of material.cut and fill for the lots, service 75 lots, construct 2.1 km of road. install 2 km of watermain and sanitary pipe.