Supply and install sanitary sewer works and tie-ins; Supply and install one lift station complete with control kiosks and rough ins for genset; Supply and install concrete lift station base and FRP antifloatation flanges; Supply and install concrete base and conduits for kiosk; Supply and install concrete bases and conduits for genset; Well Point De-Watering (water table expected ± 2m from surface); Supply and install storm sewer mains, water treatment system, headwalls, rip rap, and tie-in to existing; Roadworks; Coordination of electrical and control work including any tie-ins; and Restoration.