installation of 200mmø, 150mmø and 100mmø watermain with a combined length of ±1,500m; and ±100 service lines complete with meter boxes. Following waterworks construction, work will also include the repair of: ±15,500m² of paved road and road structure; ±3,180m of roll over curb; and landscaping repair.