Pavement rehabilitation for approximately 3,600 lineal metres of local residential and collector roads including surface milling, asphalt removal and road base reconstruction, crack sealing, crack repairs, and limited concrete sidewalk replacement. Installation of approximately 2,400 metres of 150mm, 200mm and 250mm DI replacement watermain including hydrants amd service connections and installation of approximately 1,100 metres of IT conduit.