Remove and replace forcemain with 200mm C-900 PVC forcemain by Open Cut. Tie into existing 200mm AC forcemain. Cap and abandon existing 150mm sanitary forcemain.
Remove and replace forcemain with 200mm C-900 PVC forcemain by Open Cut. Tie into existing 200mm AC forcemain. Cap and abandon existing 150mm sanitary forcemain.
TIMBRO CONTRACTING is a dynamic, innovative and growing construction company based in Agassiz, BC. Our group of experienced engineering, project management and on-site equipment operators has a reputation for innovation, integrity and collaboration second to none.
© All rights reserved. 2020. Timbro Contracting.