Phase I Construction of a New MBR Waste Water Treatment plant capacity 1375 m3/day dry day, max 3,000 m3 24 hr day up gradeable to 5,500 m3 final phase includes more than 450 m3 of concrete poured, GE Membrane filtration system, a 15 m3 Westfalia Centrifuge, Aeration system, 2mm scree screen IPC capacity 4,000 m3